Brass in London

The finished piece in location at Furness House, London

IMG_2973When the Deluxe Group asked would we assist them on their Furness House Project in London we certainly sat up and listened.
The design by Chris Thownsend called for highend brass metal fabrication and brass polishing on this front of house reception desk and this was certainly a most interesting architectural metalwork project to be part of.

Brass corners fully welded and polished

Brass corners fully welded and polished

Attention to detail with fluted detail and both mirror polished and sanded finish to the brasswork

Attention to detail with fluted detail and both mirror polished and sanded finish to the brasswork

Cable management was carefully considered during the fabrication period and the desk top flaps were fabricated and finished to match the main desk

Cable management was carefully considered during the fabrication period and the desk top flaps were fabricated and finished to match the main desk

The finished piece in location at Furness House, London

The finished piece in location at Furness House, London